Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Next Gen Consulting

Business News for Consulting

Next Gen Consulting

Business News for Consulting

  • Home
  • PR Newswire
  • Home
  • PR Newswire
Subscribe
Close

Search

News

Tata Power To Set Up Rs 54-Crore AI-Focused Global Capability Centre In Odisha

By admin
October 22, 2026 2 Min Read
0

Oct 22: Tata Power is establishing a Global Capability Centre (GCC) in Khordha district, Odisha, with an initial investment of Rs 54.31 crore. The facility, expected to become fully operational within three months, will create 110 high-skilled jobs and is the first GCC approved under the state’s dedicated GCC policy.

Tata Power To Set Up Rs 54-Crore AI-Focused Global Capability Centre In Odisha

 Representational Image 

AI-Led Energy Solutions

The centre will develop digital solutions for the power and energy sector using artificial intelligence, machine learning, generative AI and agentic AI. Its work will support asset health monitoring, demand forecasting, operational efficiency and investment planning across Tata Power’s businesses.

It will also work on emerging technologies such as knowledge graphs, blockchain, digital twins and simulation systems. These tools are expected to support renewable energy, manufacturing, power grids and pumped-hydro projects across both construction and operational requirements.

Jobs And Commercial Potential

The centre will bring together professionals in digital technology, engineering and energy analytics. Roles are expected to include AI specialists, data scientists, digital platform engineers, cloud infrastructure engineers and power-sector domain experts.

Besides serving Tata Power’s internal operations, the facility will develop digital products and services for external customers, opening possibilities to commercialise technologies created in Odisha.

Boost For Odisha’s GCC Push

Odisha’s GCC Policy, unveiled last year, aims to attract investments of more than Rs 1,000 crore and develop at least five GCC hubs across Bhubaneswar, Cuttack, Puri, Paradip, Bargarh, Jharsuguda and Sambalpur. The policy also targets over 50,000 direct and indirect jobs.

Tata Power’s project was among 19 proposals worth about Rs 3,280 crore cleared by the Odisha government in September, reinforcing the state’s effort to build a knowledge- and technology-driven services ecosystem.

Author

admin

Follow Me
Other Articles
Previous

Delhi-NCR Sees Season’s First Poor Air Day; GRAP-I Curbs Take Effect As Winter Chill Sets In

Next

Sonia Gandhi Joins Instagram, Unveils First Look Of Memoir ‘Belonging’

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Copyright 2026 — Next Gen Consulting. All rights reserved. Blogsy WordPress Theme